Demand Side Management (DSM)

Demand Side Management (DSM):


The State of Karnataka has been facing power shortages both in terms of energy and peak demand. In order to meet these shortages, the HESCOM is taking action plans to use the available resources effectively and efficiently by adopting Energy Conservation (EC) and Demand Side Management (DSM) measures to mitigate power shortages.

Awareness about Energy Saving, Energy efficiency methods- using BEE 5 star rated equipments, LED bulbs utilization, DSM tips, Solar Rooftop PV advantages and encouragement vide News Paper, audio, radio, social media,  ring back tune and by conducting awareness programs in sections and in district/Taluk/college/school events.


It includes measures initiated by the HESCOM to encourage consumers to use energy more efficiently by modifying their electricity consumption patterns, both with respect to the time and extent of electricity demand.

DSM carrying out below works,

Customer care and friendly measures.


1.    Hosa Belaku Yojane
Domestic Efficient Lighting Programme (DELP) scheme popularly known as Hosa Belaku scheme implemented in HESCOM through EESL from 04-02-2016 the sales and Energy saved details as on May 2022 is as below,

Sl. No Particulars Sold Quantity till  May -2022 Energy Saving in MU till  May -2022
01 LED Bulb 25,17,808 296.44
02 LED Tube lights 32,264 3.75
03 Energy Efficient Fans 6,825 0.92
Total 254.16

 

2. Ring Back Tune (RBT)


Utilizing communication modes for energy savings such as Ring Back Tune (RBT) for HESCOM CUG mobile nos, ¸started from 17.04.2019. The caller tune includes promotion of replacement of conventional bulbs by LED bulbs, Energy, Efficiency methods, toll free number 1912 promotions and Energy conservation messages 

 
3. Capacity Building Program for HESCOM

Capacity Building of DISCOMs programme on Demand Side Management (DSM) and Energy Efficiency: As per the MoU signed between BEE, KREDL and HESCOM dated 29th August 2018 regarding capacity building program for HESCOM. In this regard Bureau has engaged M/S Confederation of Indian Industry (CII) for HESCOM.   


• CII has conducted 5 days training program for Master Trainers from 15.10.2019 to 19.10.2019 at Hotel Naveen, Hubballi, about 43 Officers of HESCOM were participated in the Training Program.
• 3 days training program from 05.12.2019 to 07.12.2019 at Clarks Inn Bagalkot, about 34 Officers of HESCOM were participated in the Training Program.
• 3 days training program from 09.12.2019 to I1.12.2019 at Chancery Hotels, Belagavi, about 36 Officers of HESCOM were participated in the Training Program.
• The activities covered under capacity building program helps the capacity building of HESCOM and enable the HESCOM to implement the DSM action plan including shifting of load from the peak demand to period of lean demand, having different rates based on the time of day, reduction of Energy use by implementing programs to improve the efficiency of equipment, building and industrial process along with cost effective strategies.

 

4. Paper Media:


Created Awareness about Energy Saving, Energy efficiency methods- using BEE 5 star rated equipments, LED bulbs utilization awareness, DSM tips, safety procedures, Solar Rooftop PV advantages and encouragement and HESCOM services in various papers.

 

5. Radio Media:


Awareness about Energy Saving, Bill payment, safety procedures and HESCOM services, Energy efficiency methods- using BEE 5 star rated equipments, LED bulbs utilization awareness, Solar Rooftop PV advantages and encouragement etc through jingles and program in All India Radio. (from 01.12.2017 to 31.03.2018) (from 16.07.2019 to 31.03.2020) and (from 16.07.2020 to 31.03.2021)

6.    HESCOM Calendar:

HESCOM 6-sheet Calendar – 2018, 2019, 2020 with the theme of HESCOM, DSM tips, Energy efficiency methods- using BEE 5 star rated equipments, LED bulbs utilization awareness, Safety & HESCOM services, etc. The 2500 Nos of Calendars circulated to all HESCOM, KPTCL some government offices & HT Consumers to bring awareness.

 

7.    Awareness Program in academic/ educational institutions:

MoUs with academic/ educational institutes, NGO-Deshapande Education trust for creating awareness about Energy conservation amongst students and spreading the awareness through students.

 

8.    HESCOM coordinates with other ESCOMs, MNRE, SECI, KREDL and Energy Department under DSM/Energy efficiency programs.

Details of DSM activities / Programs organized Year wise to Create Awareness regarding:

• Replacement of conventional bulbs by LED bulbs.
• Regarding the benefits of using 5-star rated equipments certified by the Bureau of Energy Efficiency.
• Solar Rooftop PV advantages and encouragement for installation carried out
• Servicing new street light with LED / EE Lamps and providing timer switches to street lights and servicing IP set installations with EE / Star Rated pumps.
• Created Awareness about Energy Saving, safety procedures, DSM tips and HESCOM services,
• Toll Free Number 1912 promotions, etc.

 

FY 2018-19


1. MELANZE – 2018
       “Two Days National Level Technical Festival – MELANZE – 2018” of Smt. Kamal & Shri Venkappa M Agadi College of Engineering & Technology, Laxmeshwar on 5th and 6th April 2018 in the college campus. Awareness activities carried out through Stall.

 

2.    84 Akhila Bharata Kannada Sahitya Sammelana:

       • 84 Akhila Bharata Kannada Sahitya Sammelana from 04.01.2019 to 06.01.2019, held at Krushi Vishwa Vidyalaya, Dharwad. Awareness activities carried

          out through Stall.


       • Actively participated in program by sponsoring Rs. 4,00,000/- for T-shirts with slogan of save energy and HESCOM logo under DSM programme.  

 

3. DET: Vidyut Ulitaya Samara &DSM-Life Skill for students

Creating Awareness/ educate and up skill rural, semi urban and urban youths about Energy Conservation, Safety, etc., DSM activities joint collaboration of Deshpande Education Trust, Hubballi and HESCOM.
•    DSM-Life Skill for Students conducted in 231 ITI colleges.
•    HESCOM-DET Vidyut Ulitaya Samara Quiz Competition held on 20.06.2018 more than 500 Students Participated.

 

FY 2019-20


1. “Two Days National Level Technical Festival – MELANZE – 2019” of Smt. Kamal & Shri Venkappa M Agadi College of Engineering & Technology, Laxmeshwar on 26th and 27th April 2019 in the college campus. Awareness activities carried out through Stall. Around 4,000 No of students participated in the event.

 

2.  Vijayavani “Property Expo 2019”: May 03rd to 05th 2019 at Raikar Grounds, Hubballi. Awareness activities carried out through Stall. Around 50,000 public visited the property Expo.

 

3.  Distribution of Pamphlets with Monthly Electricity Bill: 20,00,000 Nos of pamphlets were printed and distributed with monthly Electricity bills of    June-2019 of all domestic consumers of HESCOM as per Hon’ble commission directive on Energy Conservation.

 

4.  Awareness program conducted in the sections of HESCOM: July-19 -Aug19
       Awareness programme carried out in 246 section and about 23,000 public/consumers were participated.

 

5.  Awareness program conducted in the sections of HESCOM: February-2020 Awareness programme carried out in 201 section and about 15,000 public/consumers were participated.

 

6.  PARSEC 2020: Held on 15.02.2020 to 16.02.2020 in IIT Campus, Dharwad. DSM Awareness activities carried out through Stall.

 

7.  Festival of Wrestling: Held on 22.02.2020 to 25.02.2020 KCD Ground, Dharwad. DSM Awareness activities carried out through Stall. About 50,000 – 60,000 public were participated.

DSM activities for FY 2020-21:


1. The Ring Back Tune {RBT) is provided to all Nos. of connections of HESCOM CUG group. The caller tune includes promotion of replacement of conventional bulbs by LED bulbs, Energy Efficiency methods, using BEE 5 star rated equipment’s, toll free number 1912 promotions and Energy conservation messages.

2. All India Radio: Awareness about Energy Saving, Energy efficiency methods- using BEE 5 star rated equipment’s, replacement of conventional bulbs by LED bulbs, Servicing IP installations with EE 4 or 5 star rated pumps, Solar Rooftop PV advantages and encouragement, Bill payment, safety procedures, Agriculture use, toll free number 1912 promotions and HESCOM services, etc through jingles in All India Radio.

3. Created Awareness about Energy Saving, replacement of conventional bulbs by LED bulbs, DSM tips, Energy efficiency methods- using BEE 5 star rated equipment’s, Solar Rooftop PV advantages and encouragement, Servicing IP installations with EE 4 or 5 star rated pumps, Toll free number 1912 promotions, safety procedures, HESCOM services etc in various papers.


DSM activities for FY 2021-22:


1. The Ring Back Tune {RBT) is provided to all Nos. of connections of HESCOM CUG group. The caller tune includes promotion of replacement of conventional bulbs by LED bulbs, Energy Efficiency methods, using BEE 5 star rated equipment’s, toll free number 1912 promotions and Energy conservation messages.

2. All India Radio: Awareness about Energy Saving, Energy efficiency methods- using BEE 5 star rated equipment’s, replacement of conventional bulbs by LED bulbs, Servicing IP installations with EE 4 or 5 star rated pumps, Solar Rooftop PV advantages and encouragement, Bill payment, safety procedures, Agriculture use, toll free number 1912 promotions and HESCOM services, etc through jingles in All India Radio.

3. Created Awareness about Energy Saving, replacement of conventional bulbs by LED bulbs, DSM tips, Energy efficiency methods- using BEE 5 star rated equipment’s, Solar Rooftop PV advantages and encouragement, Servicing IP installations with EE 4 or 5 star rated pumps, Toll free number 1912 promotions, safety procedures, HESCOM services etc in various papers.

 

Solar Rooftop Project:

The Solar Policy 2022-2027 has been enacted by the Government of Karnataka for the generation of renewable energy solar power on 30.04.2022. The policy aims to generate 1GW of Solar Power under Rooftop Solar and the consumers of Domestic, Industrial, Commercial and others are eligible to apply under the Net or Gross Metering System.

HESCOM has implemented the Solar Policy within its jurisdiction. Consumers can sell the electricity generated by the solar rooftop plant to the concerned ESCOM’s as per the tariff rate decided by Hon’ble KERC. Under Net Metering, Solar Power generated has to be consumed for self and excess power can be sold. Under the Gross Metering all the Solar Power generated can be sold. Under this policy, as on April-2025 5364 numbers of Solar Rooftop Power Plant, of  106.25 MW Solar capacity has been added to the HESCOM’s Grid.

 

Rooftop Solar Phase-II:

Residential Consumers:

1- 3 kW - Rs 14588/- per KW

Above 3 -10KW - Rs 7294/- per KW

      Residential Consumers:

1-3KW Rs. 18000/-per KW

Above 3 -10 KW Rs. 9000/- per KW

 

RWA/GHS:

For common facilities upto 500KW@ 10KW per house – Rs.9000/- per KW

 

PM SURYA GHAR

Residential Consumers:
   Rs.30,000/- per kW- upto 2kW
   Rs.18,000/- per kW for additional capacity- up to 3 kW

 GHS/RWA:

   For common facility including EV charging up to 500kWp (@ 3kWp per house) - Rs.18,000/kWp

 

Particulars

Nos.

Capacity in MW

Self Execution 3125 95.5122

IPDS

233

1.824

13th Finance Commission

340

2.8835

 RTS Phase-II Subsidy Scheme

204 0.87913

PM Surya Ghar Subsidy Scheme

1462 5.1530

Total

5364 106.2518

 

 

Electric Vehicle Charging Stations:

 

District wise Proposed EV charging Station locations

SI. No

District

Total No of Proposed Charging Stations

No of proposed charging stations on National Highway

Tender Status

Agency Name

Present Status

1

Dharwad

53

33

Evaluation is  under process

   

2

Gadag

10

7

Evaluation is  under process

   

3

Haveri

32

23

LOA issued

M/s Maidur Electrical Works, Haveri.

Contract Agreement executed and Survey Completed Correspondence has been made for Agreement  with Agency to concerned Govt Official in Feb 2024

4

Uttar Kannada

28

23

Evaluation is  under process

   

5

Belagavi

54

13

LOA issued

M/s Bangalore Medical system, Bangalore.

Survey under process.

6

Bagalkote

63

7

Evaluation is  under process

   

7

Vijayapur

34

22

Evaluation is  under process

   

Total

274

128

 

 

 

PM-KUSUM Project:

The Government of India has launched Scheme Pradhan Mantri – Kisan Urja Suraksha Evam Utthan Mahabhiyan (PM-KUSUM) for Farmers with components A, B and C.

Component– C:  Solarisation of 35 Lakh Grid-Connected Agriculture Pumps of individual Pump including Feeder Level Solarization.

 

Details Substation Capacity (MW) No. of Agricultural Feeders No. of IP Sets

Phase-1 (Part 1,2, 3 tender called by KREDL)

57 214.28 108 64995

Phase-2 (Tender invited by HESCOM)

29 201.34 126 44052
Total 86 415.62 234 109047

 

 

Capacity Building of DISCOMs Programme:

The following activities have been carried out by CII;

 

Area DSM Action Year 1 (MW) Year 2 (MW) Year 3 (MW) Total
Domestic LED Bulb  Replacement  2.593  0.000  0.000 2.593
LED Tube Light Replacement 22.629 15.086  0.000 37.715 
Ceiling Fan Program 1.400  1.400  1.867  4.668 
Air Conditioner Program 0.396  0.594  0.990  1.980 
Solar Water Heater Program 3.759  5.639  9.398  18.796 
Commercial LED Bulb  Replacement 0.474 0.000 0.000 0.474 
LED Tube Light Replacement 2.980 1.987 0.000 4.967 
Ceiling Fan Program 0.877  0.877  1.169  2.923 
Air Conditioner Program 0.248  0.371  0.619  1.238 
Industrial Motor Replacement Program 7.658 7.658 10.211 25.528 
Agricultural Energy Efficient Pump Program 8.938  13.407  22.345  44.690
Total Load Reduction 51.952  47.020  46.600  145.57 

 

 Other Information :

Sl. No

Particulars

 

Size

View/Download

01 Demand Side Management (DSM) Awareness Brochure. 3415 KB
02 Samples of DSM activity awareness advertisement through News Papers. 24769 KB
03 DSM Awareness Program/Events Photographs -
04 DSM Energy saving, safety etc  Awareness Jingles broadcasting All India Radio Primary Channel. 1. Using BEE 5 star rated equipments 587 KB
2. Using LED bulbs awareness 451 KB
3. Using ISI equipments 536 KB
4. Electricity saving tips using natural light 377 KB
5. Power saving advice on refrigerator use 569 KB
6. Energy saving tips 466 KB
7. Safety awareness 1 494 KB
8. Safety awareness 2 464 KB
9. Safety awareness 3 547 KB
10. Online payment 643 KB